Riverview Photos

Pictures of Riverview happenings
Home > PNG

May 2011


5-15-11_3847.jpg

John Boyer photos from PNG - May 2011

10 files, last one added on Sep 06, 2011
Album viewed 44 times

June 2011


6-24-11_049.jpg

John Boyer photos from PNG - June 2011

8 files, last one added on Oct 05, 2011
Album viewed 28 times

July 2011


07-09-11_PNG_2813029.jpg

John Boyer photos from PNG - July 2011

37 files, last one added on Oct 05, 2011
Album viewed 47 times

August 2011


08-17-11_PNG_2803629.jpg

John Boyer photos from PNG - August 2011

32 files, last one added on Oct 05, 2011
Album viewed 33 times

September 2011


9-2-11_030.jpg

John Boyer photos from PNG - September 2011

20 files, last one added on Oct 03, 2011
Album viewed 45 times

October 2011


10-29-11_126.jpg

John Boyer photos from PNG - October 2011

18 files, last one added on Oct 31, 2011
Album viewed 31 times

November 2011


11-26-11_014.jpg

John Boyer photos from PNG - November 2011

Many Blessings and thanks for the emails, cards, letters, and prayers in supporting and encouraging me while I'm over here - the Lord has been Faithful in many ways.
Blessings from PNG, John

8 files, last one added on Nov 29, 2011
Album viewed 19 times

December 2011


12-26-11_016.jpg

John Boyer photos from PNG - December 2011

27 files, last one added on Jan 02, 2012
Album viewed 29 times

January 2012


01-13-12_032.jpg

John Boyer photos from PNG - January 2012

6 files, last one added on Jan 16, 2012
Album viewed 16 times

February 2012


02-12-12_010.jpg

John Boyer photos from PNG - February 2012

5 files, last one added on Feb 13, 2012
Album viewed 22 times

10 albums on 1 page(s)

Random files - PNG
8-26-11_037.jpg
Walls9 viewsOOPS! Ok here's a mistake, somebody nailed a noggin above the stringline while the other guy nail it below- (all 3 noggins should be at the same level) no need to change it but we'll just have to watch these things.
9-16-11A_002.jpg
Site Overview14 viewsProgress as of 9/18/2011.
07-01-11_PNG_2808029.jpg
16 viewsA sunny day and poisonous berries.
08-05-11_PNG_2806029.jpg
The Facilities14 viewsAfter a lovely rain, down river from here is a laundry facility, a bathing facility, and a drinking facility -- in fact you may be using all three together at the same time. There are many of these "facilities" locally but some have dried up due to very little rain this month.
12-08-11_025.jpg
Inside work12 viewsThe other area we're working on is the hardwood floors: the upper bedrooms are completed and the dining room is also planned to be completed by the end of next week. We're also working on the plywood wall covering, and that may be a couple of weeks before that's completed. We're looking at hiring a painting crew & possibly a tile crew for the lower floor. We found a furniture business that'll make the bunk beds for about 10% above our cost and some 40% below the local warehouse, whom he also builds beds for
12-26-11_004.jpg
11 viewsOne of the upper bedrooms. Still needs windows, trim, paint and electrical, but we're making progress.
01-07-12_047.jpg
45 viewsWe're making progress in many areas, one is below. The electricians are installing the underground service and the communication cables - both have to be in there own conduits. The PNG power system utilizes 3-240Volt lines unlike our U.S. 2-120Volt lines
02-08-2012_031.jpg
26 viewsThe top floor bedrooms and hallway were sanded last week.

Last additions - PNG
02-12-12_010.jpg
32 views1st coat of varnish, trim work should be finished this week.Feb 13, 2012
02-12-12_008.jpg
29 viewsShower stall tile work still in progress.Feb 13, 2012
02-12-12_006.jpg
32 viewsKitchen cabinetsFeb 13, 2012
02-12-12_002.jpg
26 viewsThe veranda, weather permitting, should have the roof trusses and iron on at the end of the week; rain gutters also.Feb 13, 2012
02-08-2012_031.jpg
26 viewsThe top floor bedrooms and hallway were sanded last week.Feb 13, 2012
01-14-12__001.jpg
31 viewsSome more of the trenching work. Many utility lines and pipes were encountered while digging this up.Jan 16, 2012
01-14-12_012.jpg
28 viewsThe upper floor is all tongue and grooved hardwood (except the tiled bathroom). The finishing of these floors will begin once all painting and electrical work is completed. Base molding will then be installed.Jan 16, 2012
01-13-12_032.jpg
32 viewsAs of Friday the tiles are laid in the bedrooms, this hallway and the kitchen. The tiling of the bathrooms on each floor, both walls and flooring will begin this week. The dining room will be the last room tiled.Jan 16, 2012